dot.

How do you find the real bottleneck in a manufacturer with six factories?

Industry: Manufacturing

The short answer

Welding found as the true bottleneck. Inventory prediction added so purchasing never stalled the line.

What the problem was and what was done

Heavy production machinery for lighting poles and towers fitted with sensors and integrated with Oracle E-Business Suite, tracking every pole by order, stage, machine, scrap and time across six factories. The schedule was reordered to cut multi-hour changeovers.

Engagements start at 3,750 SAR per month.

More client work

All 17 client results, by the numbers · About dot. tech studio · Talk to us

Start a conversation

It takes about a minute.

We use your details only to reply to you.

Open the full interactive site →

dot. tech studio, part of dot. — Riyadh, Saudi Arabia. info@dot-cs.com

dot. home · creative studio · tech studio · tech studio profile · client results · creative consultancy · contact